三年大片在线观看哔哩哔哩,三年高清观看免费大全,三年大片观看免费大全哔哩哔哩中文,三年成全免费观看影视大全,三年中文在线观看免费高清第3季,三年成全在线观看免费高清电视剧

Kakula underground mine development has reached the edge of the high-grade ore as mining advances toward zones in excess of 8% copper
Updated:2019.09.16
From:Industrial Investment Department
  |
Robert Friedland and Yufeng “Miles” Sun, Co-Chairmen of Ivanhoe Mines (TSX: IVN; OTCQX: IVPAF) are pleased to report that underground development at the Kakula Copper Mine now has reached the high-grade ore within the deposit. Grades of approximately 4% copper have been returned from sampling, and grades are expected to significantly increase as the development crews advance the drifts toward the deposit’s central mining zones that are in excess of 8% copper in the second half of 2020.
 
“This intersection marks a significant milestone in the context of our exploration and development efforts at Kamoa-Kakula that began more than 13 years ago,” said David Edwards, Geology Manager, Kamoa-Kakula Copper Project. “Now that you can see and touch Kakula’s high-grade copper ore, it really hits home that we are well underway toward building the first of multiple high-grade copper mines in the area.”
 
The Kakula connection drift is being developed to rapidly gain access to the highest grades in the centre of the deposit, and also connect with the Kakula South ventilation decline to increase the air flow to the underground working areas in the large-scale mechanized Kakula mining operation, allowing for more development and production mining crews.
 
Share on WeChat Moments ×
Open WeChat and click on "Discover" at the bottom,
Use 'Scan' to share web pages on your Moments.
欢迎光临: 西丰县| 大庆市| 永登县| 鄂伦春自治旗| 霍州市| 都昌县| 闽清县| 和林格尔县| 靖宇县| 石林| 松原市| 霍林郭勒市| 平塘县| 揭西县| 红原县| 天峻县| 临猗县| 会同县| 广东省| 博罗县| 内丘县| 桑日县| 双桥区| 西丰县| 綦江县| 兰考县| 漳浦县| 牡丹江市| 鹤岗市| 新宾| 龙口市| 平山县| 浑源县| 普宁市| 武穴市| 东辽县| 慈溪市| 舟山市| 白河县| 石首市| 根河市|