三年在线观看免费观看大艺,三年中文在线观看免费高清第4版,三年大片大全免费观看动漫,三年在线观看大全免费,三年大片大全免费观看大全,三年免费观看在线观看大全狂飙2

Kakula underground mine development has reached the edge of the high-grade ore as mining advances toward zones in excess of 8% copper
Updated:2019.09.16
From:Industrial Investment Department
  |
Robert Friedland and Yufeng “Miles” Sun, Co-Chairmen of Ivanhoe Mines (TSX: IVN; OTCQX: IVPAF) are pleased to report that underground development at the Kakula Copper Mine now has reached the high-grade ore within the deposit. Grades of approximately 4% copper have been returned from sampling, and grades are expected to significantly increase as the development crews advance the drifts toward the deposit’s central mining zones that are in excess of 8% copper in the second half of 2020.
 
“This intersection marks a significant milestone in the context of our exploration and development efforts at Kamoa-Kakula that began more than 13 years ago,” said David Edwards, Geology Manager, Kamoa-Kakula Copper Project. “Now that you can see and touch Kakula’s high-grade copper ore, it really hits home that we are well underway toward building the first of multiple high-grade copper mines in the area.”
 
The Kakula connection drift is being developed to rapidly gain access to the highest grades in the centre of the deposit, and also connect with the Kakula South ventilation decline to increase the air flow to the underground working areas in the large-scale mechanized Kakula mining operation, allowing for more development and production mining crews.
 
Share on WeChat Moments ×
Open WeChat and click on "Discover" at the bottom,
Use 'Scan' to share web pages on your Moments.
欢迎光临: 岳阳县| 璧山县| 大冶市| 彰化市| 广宗县| 远安县| 宜宾县| 巧家县| 奎屯市| 三都| 伊宁市| 台中市| 米易县| 汤原县| 和静县| 林口县| 珠海市| 丰台区| 门源| 井冈山市| 唐山市| 巨鹿县| 灵璧县| 崇左市| 三原县| 德钦县| 皋兰县| 土默特右旗| 兴义市| 海晏县| 仁布县| 彰化市| 察雅县| 营口市| 兴文县| 江山市| 遵义县| 房山区| 阆中市| 桂东县| 洪湖市|